|
|
Committee Log In
Interpretation #2458
Original Request
-
Date:
April 30, 2025
-
Requested By:
Phil Cathey
-
Requester E-Mail:
philc@sotoarch.com
-
Code Version:
-
Code:
BUILDING
-
Code Description:
-
Chapter:
-
Section:
2319.17.2.1 (3)
-
Topic:
-
Question:
Is it the intent of Section 2319.17.2.1 (3)to require that primary plans, submitted to the Building Department for permit,include design criteria prepared by the truss system designer? (manufacturer)?
|
|
|