Interpretation #8185

Published October 18, 2018

Download Final PDF

Original Request

Code Version
2017
Code
BUILDING
Code Description
Chapter
Section
1804.5.2
Topic
Hydraulic analysis to allow fill in a VE flood zone

Question

Can a jurisdiction refuse accepting a submittal of a hydrologic and hydraulic analysis, by a registered design professional, demonstrating that fill will not have an adverse impact on the site?

Answer Published 10/18/2018 at 10:10 AM

Maybe. If the building official is also the floodplain manager and trained on the No-Rise Certificate and floodplain management standards, a VE zone is a zone where fill may not be allowed. In a VE zone, the Florida Coastol Construction Control Line (CCCL) may also be a factor. A meeting with the involved parties should be able to answer the questions.

Commentary

If the property is in a floodway, then the requirements of Item 2 of the referenced code section should be met. If the local jurisdiction is not accepting this, are they designating a specific alternative method? Is the local Building Department in charge of the Flood Management or is a different department handling this?