It would depend on whether the corridor walls form part of
the tenant separation. There are two requirements here: 1.
Rated corridor due to serving as exit access and serving
the specified occupant load. 2. Tenant separation. If
there are separate tenants across the corridor, at least
one side of the corridor walls would require rating to
complete the tenant separation.