|
|
Committee Log In
Interpretation #3339
Original Request
-
Date:
May 08, 2025
-
Requested By:
Brian D. Seufert, AIA
-
Requester E-Mail:
bseufert@garciaseufert.com
-
Code Version:
-
Code:
PLUMBING
-
Code Description:
-
Chapter:
-
Section:
1106.5
-
Topic:
-
Question:
Is it the intent of 1106.5 to require separate wall penetrations for secondary scuppers when primary drainage is by thru-wall scupper to collection box with aluminum rainwater leaders as primary drainage to grade and with cut-face (overflow) on the collector box?
|
|
|