Interpretation #8521

Published April 23, 2021

Download Final PDF

Original Request

Code Version
2021
Code
MECHANIC
Code Description
Chapter
Section
309.1
Topic
Design heating day

Question

Is it the intent of FBCM Section 309.1 to require the 1,000 sq ft office portion of a 10,000 sq ft Factory be provided with active or passive space-heating systems capable of maintaining an indoor temperature of not less than 68°F (20°C) at a point 3 feet (914 mm) above floor on the design heating day?

Answer Published 04/23/2021 at 8:21 AM

Yes, the code is clear as written.
Section 1204, FBC-Building volume also requires this.

Commentary

None.