Interpretation #8517
Published September 22, 2026
Original Request
- Code Version
- 2007
- Code
- BUILDING
- Code Description
- Chapter
- 1
- Section
- 112.1
- Topic
- connection to utilities
Question
Is it the intent of art 112.1 to require a utility disconnect at the delivery point " weather head" to remove and or relocate existing service wiring on the load side of meter socket?