Does a municipal power company need to pull a permit to change out a customer owned meter can while doing an overhead to underground conversion?
Answer Published 11/03/2015 at 10:35 AM
Typically, if the service drop, service entrance conductors,
mater and meter enclosure are owned, maintained, provided by
and installed by the utility, then 90.2 (B) (5) exempts then
from a permit.
mater and meter enclosure are owned, maintained, provided by
and installed by the utility, then 90.2 (B) (5) exempts then
from a permit.
Commentary
With that said, in most of Florida, where the utility is
governed by the Public Service Commission, the utility only
owns the actual meter; everything else past the point of
connection to the utility owned service drop is the
property and responsibility of the property owner and
requires a permit. In addition, if there is a charge for
this work, Florida Statute 489 defines this as contracting
and a license is required.