Interpretation #7621

Published September 16, 2015

Download Final PDF

Original Request

Code Version
2014
Code
BUILDING
Code Description
Chapter
Section
717.5.4
Topic
Duct through rated wall

Question

Is it the intent of Exception 4 to require sheet metal from the air handler to the diffuser/grill?

Answer Published 09/16/2015 at 11:25 AM

Yes. The designer must take into account the need for all
metal to save the expense of the damper.

Commentary

The section is clear that the sheet steel duct must be continuous between the air outlet and inlet terminals.