Interpretation #7560

Published August 01, 2015

Download Final PDF

Original Request

Code Version
2014
Code
BUILDING
Code Description
Chapter
Section
R403.2.4
Topic
Replacing an AHU in the attic

Question

Is it the intent of section R403.2.4 that new replacement air handlers in attics to be in compliance with section 405 and the conditions that are listed, or can an air handler in the attic be replaced without compliance with section R405 as long as the listed items are followed?

Answer Published 08/01/2015 at 2:55 PM

An existing attic installed air handler can be replaced in

exactly the same location and the ONLY requirement that must

be met is that matched equipment is required as specified in

R101.4.7(2).

Commentary

The section is saying air handling units may be installed in attics for new construction only when the performance path of Section 405 is used. When installing in attics, all four conditions of R403.2.4 must be met. The conditions are a Florida specific amendment which was the result of an agreement between the Florida Building Commission and the Florida Home Builders Association to resolve a rule challenge in the first edition of the code. The first edition prohibited the installation of air handlers in attics outright. Not sure where the requirement that the unit be installed using the performance method originated, but it first showed up in the 2010 Edition.