Interpretation #7162

Published May 09, 2013

Download Final PDF

Original Request

Code Version
2010
Code
BUILDING
Code Description
Building
Chapter
1
Section
105.1
Topic
Separate Permits

Question

Is it the intent of Section 105.1 to require a separate permit for each structure. Can multiple structures on 1 lot be applied for under 1 permit or is a separate permit required for each structure.

Answer Published 05/09/2013 at 6:34 PM

105.1 does not contain the requirements for the number of
permits required for individual projects. That requirement is
up to the AHJ.

Commentary

None.