Interpretation #7042
Published August 08, 2012
Original Request
- Code Version
- 2007
- Code
- ELECTRIC
- Code Description
- Electrical
- Chapter
- 3
- Section
- table 300.5
- Topic
- PVC conduit
Question
Is it the intent of table 300.5 to require a schedule 40 PVC conduit to be installed at adepth of 24" as opposed to being encased in the 8" deep on ground concrete slab, as required by other sections of the FBC,for a nonresidential parking lot
Answer Published 08/08/2012 at 4:48 PM
Yes. Per Table 300.5, Column 3, The
2008 National Electrical Code requires
24" of cover.
2008 National Electrical Code requires
24" of cover.
Commentary
None.