Interpretation #6703
Published April 19, 2011
Original Request
- Code Version
- 2007
- Code
- BUILDING
- Code Description
- Building
- Chapter
- 1
- Section
- 114
- Topic
- Stop Work Orders
Question
Is it the intent of the Code for the Building Official to issue a Stop Work order if the work complies with the minimum requirements of the Code but not with the approved plans submitted with the permit application? Example #1: the approved plans show 3 coat 7/8" thick stucco on CMU but the contractor installs a 2 coat 1/2" stucco which fully complies with ASTM C 926 and Section 2512. Example #2: The structural engineer of record indicates on the approved plans that the minimum design pressure for components and cladding is +/-60psf but the Architect specifies a window which has a Florida Product Approval for +/- 100 psf. The contractor installs a window with a FPA of +/-65psf. What authority, if any does the Building Official have in these cases? Is non-compliance with the plans a "code violation" even though the work as installed complies with the minimum requirements of the Code?
Answer Published 04/19/2011 at 4:49 PM
NO, it's not the intent of this section to "require" the
Building Official to issue a stop work order. But in
accordance with section 114.1 the Building Official has the
discretionary authority to issue a stop work order if he/she
determines that the work is being performed in a manner
either contrary to the provisions of the code or is
dangerous or unsafe.
According to 106.4 If work does not match the "approved"
plans it must be "resubmitted for approval as an amended set
of construction documents."
Building Official to issue a stop work order. But in
accordance with section 114.1 the Building Official has the
discretionary authority to issue a stop work order if he/she
determines that the work is being performed in a manner
either contrary to the provisions of the code or is
dangerous or unsafe.
According to 106.4 If work does not match the "approved"
plans it must be "resubmitted for approval as an amended set
of construction documents."
Commentary
Inspection Holds can be an effective way to control these
types of situations without stopping work altogether.
The contractor should be aware that at the end of the
project the designers may not agree to a field change that
deviates from their design requirements which could result
in delays, and removal/replacement of components or material.