Interpretation #6595
Published August 19, 2010
Original Request
- Code Version
- 2007
- Code
- BUILDING
- Code Description
- Building
- Chapter
- 10
- Section
- 1006.2.3
- Topic
- Egress Lighting
Question
Is it the intent of Florida Building Code - Building Section 1006.2.3 to require means of egress lighting to be equipped with battery back-up even when the means of egress lighting is powered by two completely separate and circuited power sources, one being utility supplied power and the other an emergency generator?
Answer Published 08/19/2010 at 6:23 PM
It depends. Please see the attached commentary.
Commentary
The question does not state if this is a legally required
system or not. It appears to state an emergency "system" is
installed with completely separate wiring systems with no
connection to each other and yet does not state if an
automatic transfer switch is installed or if the generator
will pick up any loads within the required 10 seconds.
Other issues may also need to be addressed, including
occupancy and load. An emergency power system is generally
designed and supplied by both normal and generator power.
In some cases, it is relay controlled to transfer power
from a normal source to an emergency source using a
transfer switch. If normal power is lost, a generator will
feed the emergency system through the automatic transfer
switch. The code does not generally intend to require three
different sources of power. Additionally, a DEC statement
that was issued by the State Fire Marshal a few years ago
specifically allows this condition in a specific case.
Further, if half the lights are on "normal" power and half
are on "emergency," no one manual act could leave the path
of egress in darkness, because the distributions are
separate all the way to the source of supply. If the source
of supply fails, the generator kicks in. While the question
is based in the building volume, careful reading of the
documentation indicates the NEC allows an alternate
(second) power source from the utility if it is deemed
reliable. If only the standard utility source is used, a
battery backup system would be required. If a generator
capable of picking up the load within 10 seconds and tested
in accordance with the governing documents is used, the
code allows that as it is not depending on the power
company. The building code commentary provides reference to
the utility and NEC requirements and the commentary does
not disallow the generator.