Original Request

  • Requested By: Matt Butler
  • Requester E-Mail: MButler@largo.com
  • Code Version: 2021
  • Code: MECHANIC
  • Code Description:
  • Chapter:
  • Section: 309.1
  • Topic: Design heating day

  • Question: Is it the intent of FBCM Section 309.1 to require the 1,000 sq ft office portion of a 10,000 sq ft Factory be provided with active or passive space-heating systems capable of maintaining an indoor temperature of not less than 68°F (20°C) at a point 3 feet (914 mm) above floor on the design heating day?

Answer:

Yes, the code is clear as written.
Section 1204, FBC-Building volume also requires this.

Commentary:

None.